Bridge / Bridge Guide / Bridge Brake

The so called “Bridge” for transferring single faced web to the Bridge Guide and Bridge Brake is available for single, double or triple wall board.
At the end of the Bridge the BHS Corrugated Bridge Guide WEBTROL detects and regulates the position of the single faced web and allows an exact positioning towards the center or the outer liner. Bridge Brake of BHS Corrugated ensures a precise and constant web tension and an optimized and consistent heating, glue application and subsequent adhesion.

corruDUR

Only the perfect interaction of all components ensures consistent maximum performance in the production of corrugated board. Our specially developed…

One classroom equals one corrugator

Take part in our Social Responsibility Project: Buy one corrugator, leave aside the final discount and receive a sponsorship for one classroom in…

BHS Corrugated is one of Germany´s TOP 100 mid tier companies

BHS Corrugated has made a bound among the best in the 26th issue of the TOP 100 innovation challenge. On the basic of academic system TOP 100…

Norbert Städele retires from BHS Corrugated

After more than 20 years as Chief Technical Officer (CTO) and Managing Director, Norbert Städele retires from BHS Corrugated. Starting in 1998, he…

Mexican customer of BHS Corrugated set production record

Our customer Grupo Gondi in Mexicali, Mexico, set a new production record on its corrugator, designed by BHS Corrugated. In 8 hours and 44 minutes,…

iCorr® Shop

With the new iCorr® Shop of BHS Corrugated, you now have an even more user-friendly online solution at your disposal for facilitating your spare parts…

Productivity Service - your benefits
  • Ensuring corrugator availability, performance and quality thanks to a well-founded approach (Masterplan)
  • Results-oriented proficient services

BHS Corrugated

Maschinen- und Anlagenbau GmbH

Paul-Engel-Str. 1

92729 Weiherhammer

 

+49 (0) 96 05 - 919 - 0

info@bhs-world.com

http://www.bhs-world.com